VAF,
While slowly cruising along on the horizontal stabilizer spar preparation, I believe I'm about to run into an issue. I previously cleco'd together the HS-702 spars, HS-00003 spar doublers, and the HS-810/814 angles and drilled all holes inboard of the 6 degree bend line. The HS-00003 was already pre-drilled so it took all the guess work out of hole placement (or so I thought). My next step is to make the relief notches in the HS-702 spars. However, once I make the 1/4 inch holes, the edge distance minimums will be broke. I will only have between .174 to .230 inches on the closest 4 rivet holes if I proceed. Has anyone seen this before and have any advice? Thanks in advance!
Dustin
(3rd time poster but 1st time picture attempt. Fingers crossed it works)
While slowly cruising along on the horizontal stabilizer spar preparation, I believe I'm about to run into an issue. I previously cleco'd together the HS-702 spars, HS-00003 spar doublers, and the HS-810/814 angles and drilled all holes inboard of the 6 degree bend line. The HS-00003 was already pre-drilled so it took all the guess work out of hole placement (or so I thought). My next step is to make the relief notches in the HS-702 spars. However, once I make the 1/4 inch holes, the edge distance minimums will be broke. I will only have between .174 to .230 inches on the closest 4 rivet holes if I proceed. Has anyone seen this before and have any advice? Thanks in advance!
Dustin
(3rd time poster but 1st time picture attempt. Fingers crossed it works)