MH53EDriver
I'm New Here
Greetings,
I'm a first-time builder and am building the horizontal stabilizer portion of my empennage kit and want to remove the portion of the lower flnges (to accomodate the elevator horns) on the rear spar before I begin assembling the structure. Refer to DWG 3 and DWG 27A. I'm not clear in understanding whether the "1" means to remove one inch from each flange or not. Can someone suggest the minimal amount of material to remove from each flange. I just think it will be easier to make the cuts now before assembly as opposed to later. Also feel free to add any tips or suggestions or lessons learned. Thanks in advance to all and Happy Easter.
Rob.
I'm a first-time builder and am building the horizontal stabilizer portion of my empennage kit and want to remove the portion of the lower flnges (to accomodate the elevator horns) on the rear spar before I begin assembling the structure. Refer to DWG 3 and DWG 27A. I'm not clear in understanding whether the "1" means to remove one inch from each flange or not. Can someone suggest the minimal amount of material to remove from each flange. I just think it will be easier to make the cuts now before assembly as opposed to later. Also feel free to add any tips or suggestions or lessons learned. Thanks in advance to all and Happy Easter.
Rob.