So I am working on the Vertical Stabilizer for the -12 and noted today that unless the #30 hole is one that I have final drilled/or match drilled (like in the rear spar), the LP4-3 rivets won't fit in there.
So for example, no where in the instructions does it claim you need to final drill all the #30 holes on the flanges, but I suspect that unless I do that I won't be fitting these rivets.
Can someone confirm if you had to do that?
Also, I have been re-reading section 5 over and over again, and haven't seen it.
So for example, no where in the instructions does it claim you need to final drill all the #30 holes on the flanges, but I suspect that unless I do that I won't be fitting these rivets.
Can someone confirm if you had to do that?
Also, I have been re-reading section 5 over and over again, and haven't seen it.