I am not the builder but I have plans and construction manual, have reviewed them thoroughly and cannot find the answer to this question. The drawings seem to suggest it's ok but only in reference to static line installation on opposite side.
We are doing avionics upgrade and need to run additional wiring from front to back. The existing holes (one in each bulkhead) in the aft bulkheads are already filled with wiring and we don't want to disturb them anyway. Is it ok to drill another 1/8 inch hole in each bulkhead (right side looking forward), install another snap bushing and run the new wires thru the new holes?
We are doing avionics upgrade and need to run additional wiring from front to back. The existing holes (one in each bulkhead) in the aft bulkheads are already filled with wiring and we don't want to disturb them anyway. Is it ok to drill another 1/8 inch hole in each bulkhead (right side looking forward), install another snap bushing and run the new wires thru the new holes?