Golf Echo
Active Member
Another quick question...
In clecoing together VS-412PP and VS-803PP, there is a small gap on each side as the upper VS-412PP hinge bracket contacts the radius of the VS-803PP spar flange bend. I assume this should be made to lay flat before match-drilling and riveting?
Thanks again.
In clecoing together VS-412PP and VS-803PP, there is a small gap on each side as the upper VS-412PP hinge bracket contacts the radius of the VS-803PP spar flange bend. I assume this should be made to lay flat before match-drilling and riveting?
Thanks again.