I'm at the point in the fuselage kite where there's not much more aluminum work to do - which means I can't keep putting off the panel and harnesses. No more excuses left, so here's the first pin and a start on the first D-sub for screen one of the G3X. Still need to put labels on, and I need to finalize the layout of the sub-panel so I have an idea how long the wires should be. Also, first botched solder sleeve, followed by two that checked OK with the ohm meter. I can see where this is going to take several weeks, but hope to speed up as the education turns into recreation, or something...
==dave==
![30n9jcn.jpg](/proxy.php?image=http%3A%2F%2Fi43.tinypic.com%2F30n9jcn.jpg&hash=38d46c0964d9afb544a0c01ded8d3917)
![bg78dd.jpg](/proxy.php?image=http%3A%2F%2Fi41.tinypic.com%2Fbg78dd.jpg&hash=86e39a2c897bf4fa1626ee152d61e14a)
==dave==