jamcgee1978
Active Member
Afternoon all,
Wondered if you could offer advice,
I have mounted the elevators but my travel is 26° up and 30° down . My worry is if I file away the F1012D to gain the extra 4° it may be enough material for the elevator stop to potentially jam as per service bull 18-03-30. My inspector has suggested we manufacture a stop using Delrin at the 30° up but I would seek vans advice primarily before going away from plans. Have attached a few pics for clarity. Anybody had any similar issues with this and advice more than welcomed
Thanks James
https://drive.google.com/open?id=1vwWRDBFRkOBc8Zpu5LwL3wJjwrRgWth6
https://drive.google.com/open?id=1FU968uB29-tEf33UuOMokSJQiTjdArFv
https://drive.google.com/open?id=1bZ4KAomgj5iaHymmAe5i5dzQam71qLHb
Wondered if you could offer advice,
I have mounted the elevators but my travel is 26° up and 30° down . My worry is if I file away the F1012D to gain the extra 4° it may be enough material for the elevator stop to potentially jam as per service bull 18-03-30. My inspector has suggested we manufacture a stop using Delrin at the 30° up but I would seek vans advice primarily before going away from plans. Have attached a few pics for clarity. Anybody had any similar issues with this and advice more than welcomed
Thanks James
https://drive.google.com/open?id=1vwWRDBFRkOBc8Zpu5LwL3wJjwrRgWth6
https://drive.google.com/open?id=1FU968uB29-tEf33UuOMokSJQiTjdArFv
https://drive.google.com/open?id=1bZ4KAomgj5iaHymmAe5i5dzQam71qLHb