cjensen
Well Known Member
I need the drawing for installing the flap handle in the fuselage.
I have the drawing that shows the construction of the handle and it's internal parts, but I need to see what the plans call for for installing the weldment thru the buklheads. On the 7 plans, the weldment mounts behind the bulkhead, but the longer rear arms of the 6 manual weldment looks like it goes THRU the bulkhead.
Does anyone have a pdf of this drawing, or can someone mail me a copy?
Thanks!
I have the drawing that shows the construction of the handle and it's internal parts, but I need to see what the plans call for for installing the weldment thru the buklheads. On the 7 plans, the weldment mounts behind the bulkhead, but the longer rear arms of the 6 manual weldment looks like it goes THRU the bulkhead.
Does anyone have a pdf of this drawing, or can someone mail me a copy?
Thanks!