On page 12-02 it calls to install nutplates with flush rivets for the tail fairing. I don't see a possible way to dimple the aft most nutplate rivet holes let alone rivet them, there is only about 1/2 to 3/4 inch of room in there, the tools/bucking bar/etc won't fit. Can anyone recall how they did this? Thanks for any guidance!
Last edited: