I find myself entering the next learning phase of the building experience and with that phase, new questions are arising.
I am routing standard van's conduit X 3 from the back seat, under the floor of the baggage area to the rear of the plane on both sides. Probably overkill but while it is open, easy to do. I plan on running the conduits under the step in the outermost bay of the baggage area. I feel like I have three options for this area.
1. I can just let the conduit lay on the skin.
2. I can try and proseal attach the conduit to the skin.
3. I could zip tie the conduit to the step structure.
I have read that it is bad form to zip tie things to the engine mount due to vibration etc, but wasn't sure about doing so in the body of the fuselage.
Any comments welcome
Thanks
I am routing standard van's conduit X 3 from the back seat, under the floor of the baggage area to the rear of the plane on both sides. Probably overkill but while it is open, easy to do. I plan on running the conduits under the step in the outermost bay of the baggage area. I feel like I have three options for this area.
1. I can just let the conduit lay on the skin.
2. I can try and proseal attach the conduit to the skin.
3. I could zip tie the conduit to the step structure.
I have read that it is bad form to zip tie things to the engine mount due to vibration etc, but wasn't sure about doing so in the body of the fuselage.
Any comments welcome
Thanks
Last edited: