Can any one think why I can not build the leading edge onto the main spar without setting the whole shotin match in the jig? I.E lay the spar on a flat surface, set the L/E ribs in place and put the skin on.
There is a reason I would like to do it this way. Due to the temperature in the hanger at present, it is not practicle to work out side of the airconditioning, there is a room at work that I can use, but I have to keep it useable for work stuff. If I can assemble the L/E on its own, I can keep working untill it cools down, then move the project out into the hanger.
Cheers
Bill
There is a reason I would like to do it this way. Due to the temperature in the hanger at present, it is not practicle to work out side of the airconditioning, there is a room at work that I can use, but I have to keep it useable for work stuff. If I can assemble the L/E on its own, I can keep working untill it cools down, then move the project out into the hanger.
Cheers
Bill