Frankster13
Active Member
I have been conducting several tests as per EAA, FAA protocol as I prepare for my DAR inspection. With this said, what exactly should I be entering in the logs? Or do I not make any log entries until the aircraft is certified airworthy (build complete post DAR inspection)? I have done pitot static, compression, fuel flow, engine test run, etc.