Flying Scotsman
Well Known Member
I'm finishing all the prep work on the forward fuselage, getting ready to put it all back together and rivet things, but I noticed on one builder's site that he had drilled the main gear weldments to the side (the big honkin' gear attach webs and side skins) during the *previous* step, when everything was all together for drilling the stiffeners and whatnot. I didn't do that (there was no instruction to do so), and now I'm thinking I should have. However, other sites that I looked at didn't mention doing it at that time.
What say you all? should I have done that (meaning a relatiively time-consuming operation of putting things back together and drilling that weldment now), or did you do it at a later stage and was there any problem in doing so?
Thanks for the assistance...
Steve
What say you all? should I have done that (meaning a relatiively time-consuming operation of putting things back together and drilling that weldment now), or did you do it at a later stage and was there any problem in doing so?
Thanks for the assistance...
Steve