Almost 6 years of operation. Approximately 200 hours since completion, everything has operated flawlessly with zero issues. We removed the entire original wiring, and completely rewired the airplane. Panel is constructed of a single piece of .090 supported with angle just above the arch. Shelf is supported on the front side by small brackets tied to the upper gear towers. The structure created, was overbuilt on purpose. I am convinced you could lift my airplane with a crane and a hook attached to the panel arch.
Zero vibration issues with GSU25 mounted to GDU460. As I move forward, without a ruler to the back of the 460, it looks like the 116 should fit fine, with some hopefully easy wiring and connector changes and the orientation change of the GSU25.
Food for thought on GSU25 Vibration. This is the internet, your mileage will certainly vary. This is also experimental and so far the experiment has worked great.
View attachment 123199View attachment 123195View attachment 123196View attachment 123197View attachment 123198View attachment 123200