Hello. On the Vertical Stabilizer, page 06-02 step 7 has you riveting a doubler to the spar. At this point nothing is primed. The plans don't have you priming anything until 06-04 step 3.
I know all about the primer wars. I've read section 5.1. What I don't understand is why the instructions say the time to prime is after you've already riveted some things together. Is there something special about this doubler that priming it before riveting is unwarranted?
I know all about the primer wars. I've read section 5.1. What I don't understand is why the instructions say the time to prime is after you've already riveted some things together. Is there something special about this doubler that priming it before riveting is unwarranted?