Default RV-12is Rudder cable link lengths

Kind of a tongue twister that title

I am building my RV-12is in a fairly constrained space and it would be very convenient for me if I could install the forward F-01258 rudder cable links without using the prescribed process in the plans. I do not yet have the tail cone installed, but would like to install these links prior to the forward tunnel access being constrained. I understand it is possible they might have to be replaced in the future if I get the length wrong, but they are not expensive and from what I understand, the length is not critical unless they are so long that the rudder pedals hit the firewall before the rudder stops.

Bottom line....does anyone have recorded the lengths of their measured rudder cable links that you can share, or even a picture showing specifically what set of pre-drilled holes you ended up using?

Thanks in advance,

Walt Cannon
RV-6 N36WC - 1993
Currently building RV-12is
Reply With Quote
  #2  
Old 11-17-2021, 12:06 AM
rvbuilder2002's Avatar
rvbuilder2002 rvbuilder2002 is offline
 
Join Date: Jul 2005
Location: Hubbard Oregon
Posts: 9,667
Default

The reason for the prescribed process, is that the rudder cables have an overall length dimension tolerance and they vary in length slightly.
Properly sizing the links is how that variation is compensated for.
If the overall length ends up too long, portions of the pedal assemblies can contact the firewall before the rudder hits the rudder stops.
__________________
Opinions, information and comments are my own unless stated otherwise. They do not necessarily represent the direction/opinions of my employer.

Scott McDaniels
Hubbard, Oregon
Van's Aircraft Engineering Prototype Shop Manager
FAA/DAR
RV-6A (aka "Junkyard Special ")
Reply With Quote
  #3  
Old 11-17-2021, 09:22 AM
ZenithDriver ZenithDriver is offline
 
Join Date: Oct 2020
Location: Seattle
Posts: 2
Default

Hi Scott,

Thanks for that verification. I think I understand why it is recommended to do it the way the KAI suggests. I am just looking to try and not have to get back into the tunnel when the airplane if fully wired and fitted out in in the cockpit. I am hoping to get some typical rudder link sizes that have worked for others. Worse case, if I do them now and they are too long, I would to do them over again later and shorten them up with the reduced access.

Still looking for info if anyone else has it available.

Cheers,

WC
Reply With Quote
  #4  
Old 11-26-2021, 12:25 PM
EchoJuliet EchoJuliet is offline
 
Join Date: Oct 2021
Location: Everett, WA
Posts: 2
Default

I had the same concern a couple years ago. I ended up temporarily attaching the aft fus, vertical fin, and rudder in order to get the correct lengths. You may want to consider that option. My link hole to hole center dimensions are 1 29/32 (left) and 25/32 (right), but like Scott mentioned each airplane may be different due to cable length tolerance.
Reply With Quote
  #5  
Old 11-29-2021, 07:01 PM
JwWright57 JwWright57 is offline
 
Join Date: Dec 2016
Location: Charlotte, NC
Posts: 266
Default

Quote:
Originally Posted by EchoJuliet View Post
I had the same concern a couple years ago. I ended up temporarily attaching the aft fus, vertical fin, and rudder in order to get the correct lengths. You may want to consider that option. My link hole to hole center dimensions are 1 29/32 (left) and 25/32 (right), but like Scott mentioned each airplane may be different due to cable length tolerance.
I did the same. I think itís worth it in the long run. You donít want to get those lengths wrong, itís difficult to get in there if you need to change them later
__________________
-----------------------------------------
Jeff Wright, Charlotte NC
Rv-12is with 912is and Dynon system.
Certified Aug 2021
Dues paid 2021
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 07:11 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.