VansAirForceForums  
Home > VansAirForceForums

-POSTING RULES
-Advertise in here!
- Today's Posts | Insert Pics

Keep VAF Going
Donate methods

Point your
camera app here
to donate fast.


Go Back   VAF Forums > Main > RV Building Tips/Techniques
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 09-05-2021, 09:43 PM
ryane67 ryane67 is offline
 
Join Date: Feb 2020
Location: Lake Orion, MI
Posts: 26
Default control surface practice kit question - deforming rib flange

I had a friend over today and we were building a control surface practice kit, wow they really go fast with 2 people and you form an assembly line type situation..

Anyway, when we were riveting the rib to the spar and the doubler, we came across something I could not explain.

We used AN470AD4 as described in the plans, with the manufactured head on the doubler side. When using the pneumatic squeezer to create the shop heads, the rivet squished nicely but it practically dimpled the rib flange!
The 3-layers of metal directly surrounding the rivet were tight but further away from the rivet a gap between the spar and the rib flange becomes apparent. EDIT: to be clear, there was no rivet squeeze-out between the 3 layers of aluminum.

Drilled out the rivet, cleaned up the flange, repeated the process, but it happened again! really scratching my head here, but moved on to the other side knowing this is not something we'd be OK with keeping on an actual plane.

On the other side I decided we should reverse the rivet (manuf head on the inside, thinner material) and use an offset set with the gun and bar.. those two came out nicely and no deforming metal.

Is there something about using the squeezer on 3-layers? Is it something to do with pressure applied to thinner vs thicket materials stacked together? Trying to learn from this because I know there are places where you've got 3 layers to rivet together pretty early on in the empenage and I'd rather trash scrap than the real thing
__________________
Ryan
RV14 tail on order, expecting to begin late 2021.
VAF donation made `21

Last edited by ryane67 : 09-05-2021 at 09:48 PM.
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 03:09 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.