-POSTING RULES

-Advertise in here!
-
Today's Posts
|
Insert Pics
Keep VAF
Going
Donate methods

Point your
camera app here
to donate fast.
|

02-08-2014, 03:26 PM
|
 |
|
|
Join Date: Jul 2009
Location: Coeur d'Alene, ID/Casa Grande, AZ
Posts: 654
|
|
Quote:
Originally Posted by HeliCooper
Done and done.
If everyone wants to move forward with this then I created a document. Anyone that clicks on the below link can view and edit the document. If we can get a moderator to sticky the link at the top of the RV14 forum it should be an easy find for everyone.
As for formatting I will look to you building for what you think is the most logical solution. I was thinking the first column can be the section number/step number and then next column could be the description of what to watch out for. This way I can periodically, once a week or so, go into the document and reorder the steps so that it will be easy to find. This way when you are on your way out to work on a certain step you can you scroll to the area and see if there are any common problems. If we can all decide on a format here I will insert at the top the column headings and instructions for adding to the list.
Let me know if there is anything else I can do.
https://docs.google.com/spreadsheet/...FE&usp=sharing
|
Really a slick idea......would be great for each of the RV model threads..
__________________
Ric Dickison
307 (CAB) Phantom
Search and Destroy (Can Tho RVN)
Distinguished Flying Cross Society Member
CH-47 & UH-1H "Driver"
Rotax 9 Series Service IRMT
RV-12 Kit#729 "N312RD" is now a full functioning fun machine!! Thanks Van for fulfilling my dream😎
2018 Dues Paid
|

05-23-2014, 07:59 PM
|
|
|
Join Date: Apr 2014
Location: Colfax, NC
Posts: 38
|
|
Possible Error?
Ok please correct me if I'm wrong, on page 06-04 step 4, you're told to dimple the flanges of all internal spars and ribs with the exception of VS-707? This makes no sense. Given the fact the plans tell you it dimple the VS-801 skin for 426 rivets. I think this may be a minor error?
|

05-23-2014, 09:17 PM
|
|
|
Join Date: Jun 2013
Location: Des Moines, IA
Posts: 255
|
|
Yes dimple the long flanges of the VS707
|

09-15-2014, 04:52 AM
|
|
|
Join Date: Jul 2014
Location: Orlando FL
Posts: 74
|
|
Small Bag reference to plans sections?
I have looked at the spreadsheets and can't find a list that correlates the small bags to plans sections. I can't really tell by looking at plans and bag inventories if there is a one to one or one to two correlation.
Several other RV guys said empty the bags in to the tackle box divider trays, label the compartments and pick parts from there. Seems the common practice but I can't believe that a kit as well engineered as this isn't organized that one last step. I just can't find the documentation.
Information or opinions.
__________________
Terrell Yon
Orlando FL, KCOI Merritt Island Home airport
140173 Kits Underway
Tail kit structurally complete
Wings in progress
N87TY on hold
EAA 724 and 74 Member
|

09-15-2014, 05:44 AM
|
|
|
Join Date: Nov 2007
Location: Yarmouth, Nova Scotia
Posts: 2,489
|
|
There is no correlation between the bags and the sections of the kit. The first bag you dip in might also be the same bag you pull from for the last section of that kit. One reason for this is that parts that look the same and are used on the same part are put into different bags so you can figure out which is which.
__________________
Thanks Ron
RV-10 SOLD
RV-14 Flying
AirCam flying
|

09-15-2014, 06:35 PM
|
|
|
Join Date: Jul 2014
Location: Orlando FL
Posts: 74
|
|
Bag correlation
Aha.... part of the 51% rule I suppose. The tedious hours sorting through things.
The tackle trays and baby food jars it is. Now I have something to do between getting my vertical stab deburred and my primer coming. Where was that label maker my wife had?
Thanks.
__________________
Terrell Yon
Orlando FL, KCOI Merritt Island Home airport
140173 Kits Underway
Tail kit structurally complete
Wings in progress
N87TY on hold
EAA 724 and 74 Member
|

10-17-2014, 09:51 PM
|
|
|
Join Date: Jan 2013
Location: Alberta, Canada
Posts: 8
|
|
Addition to plan Gottchas
Step 7 on Page 08-02 asks to scuff the powder coating on the hinge brackets for HS. Step 3 on page 06-04 after "disassemble and deburr parts" should include " Scuff the powder coating on the hinge brackets if you plan to paint them". Being new builder I didn't do it for VS because there is no such step in the plans for VS. Now that they are riveted in place it will take extra time to get it done. 
__________________
 RV - 14 Empennage # 140089
|

10-25-2014, 08:39 AM
|
|
|
Join Date: Nov 2012
Location: Midland, mi
Posts: 963
|
|
I added all the hardware for each bag to the spread sheet. someone else check to make sure I did not make a mistake.
__________________
Ken Stockman
Midland, MI
EAA Chapter 1093 member
FaceBook Page: Ken's RV-14
RV-14a (serial number 140073)
N73XP
Plane at hangar and the wings ON.
|

11-10-2014, 06:42 AM
|
|
|
Join Date: Sep 2014
Location: Aiken, SC
Posts: 12
|
|
Pg 06-04 Dimpling Question - Emp. Fairing Attach Locations
Do you dimple the places in VS-704, VS-705 & VS-801PP where it says LEAVE OPEN FOR EMPENNAGE FAIRING ATTACH, 6 PLACES ON EACH SIDE OF ASSEMBLY? I put tape over the holes and left them alone, but I am about ready to rivet the VS together.
Last edited by HHKing : 11-10-2014 at 10:17 AM.
|

11-10-2014, 10:09 AM
|
|
|
Join Date: Nov 2007
Location: Yarmouth, Nova Scotia
Posts: 2,489
|
|
It's been a while but the emp fairing is made of glass and you countersink the glass. So those holes to attach it do not need dimpling.
__________________
Thanks Ron
RV-10 SOLD
RV-14 Flying
AirCam flying
|
Thread Tools |
Search this Thread |
|
|
Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -6. The time now is 09:30 PM.
|