Old 01-09-2021, 11:33 PM
Meat Meat is offline
 
Join Date: Jan 2018
Location: Glendale, AZ
Posts: 21
Default RV-14 Temporary Fuselage Flooring for Riveting

Hi All,

I've got my aft fuselage clecoed to my front QB fuselage along with the adjacent bulkheads and now thinking about how to attack all the rivets. It's apparent that some sort of temporary flooring over the baggage floor and seat pan ribs will be needed so I can get into the fuselage for riveting. I'm a big guy at 6' 4", 260 lbs. The last thing I want to do is damage those individual and fairly flimsy floor ribs. I was thinking that 3/8" plywood cut to fit the floor would be rigid enough to distribute my weight adequately over all the floor rib flanges. Any feedback from those that have already crossed this bridge would be appreciated, particularly if you're on the bigger side.
Thanks for your time and advice.

Cheers,

Scott
__________________
QB RV-14 #140702
Empennage kit finished
Working on fuselage
Reply With Quote
  #2  
Old 01-10-2021, 06:06 AM
Bgill Bgill is offline
 
Join Date: Sep 2017
Location: Douglas, GA
Posts: 77
Default Alternative idea

Rather than get in, I used some 3 ft. boards that fit between the spars. Then drilled 2 holes to correspond to the wing bolt holes. Put 2 long bolts with the threads cut off (drift pins). I had mine drilled so that the fuse/tail cone set around 6-8 inches off the floor. Placed a padded saw horse/table at the tail cone and rolled the fuse/tail on the side. The 3 ft boards offer stability and keep the airframe from rolling on over. I was able to roll and manipulate mine my self.

It really simplified the riveting, wiring, etc. it was much easier to sit on a stool and lean into the airframe than to get in. Iíll have to look and see if I have any good photos.
__________________
Byron
RV-14A 140466 In build - Final Assy.
RV-10 40253 N253RV Sold
Douglas, GA. 2020 Dues paid
Reply With Quote
  #3  
Old 01-10-2021, 06:26 AM
Bgill Bgill is offline
 
Join Date: Sep 2017
Location: Douglas, GA
Posts: 77
Default Alt idea photos

Found a few images - for some reason none while on the side.
__________________
Byron
RV-14A 140466 In build - Final Assy.
RV-10 40253 N253RV Sold
Douglas, GA. 2020 Dues paid

Last edited by Bgill : 01-10-2021 at 06:58 AM.
Reply With Quote
  #4  
Old 01-10-2021, 12:32 PM
Meat Meat is offline
 
Join Date: Jan 2018
Location: Glendale, AZ
Posts: 21
Default Photos

Thanks for the reply Byron. I've been thinking about a good way to manipulate the fuselage on its side for better access. I'm interested in any photos you have of your technique. Thanks for your time.

Cheers,
Scott
__________________
QB RV-14 #140702
Empennage kit finished
Working on fuselage
Reply With Quote
  #5  
Old 01-10-2021, 12:47 PM
David Paule David Paule is offline
 
Join Date: Dec 2009
Location: Boulder, CO
Posts: 4,657
Default

On my RV-3B, I made work platforms from 1/2" plywood. I designed the pieces so that I could install them one by one, since the RV-3 fuselage is so narrow. The only thing that I didn't get right is to make certain that the pieces can't tip. While it's not hard to un-tip them and change my position, it's often awkward and tools can slide under a piece, and it's difficult to get under a floor that I'm laying on.



Dave
Reply With Quote
  #6  
Old 01-10-2021, 06:56 PM
asw20c asw20c is offline
 
Join Date: Jun 2010
Location: Edgewood, NM
Posts: 211
Default

Hi Scott,
I JUST finished that step myself this weekend. I had thought about some sort of temporary flooring for riveting too, but the real answer turned out to be simply building a rotisserie. If you are able to roll the fuselage 45 and 90 degrees left and right you will be able to access all the rivets that join the tailcone to the forward fuselage. Not all of them are easily accessed, but they would be impossible otherwise. And if you start with a harbor freight engine stand, you will have very little to build to complete the rotisserie.
__________________
Empennage Complete
Wings Complete
Fuselage Underway
Reply With Quote
  #7  
Old 01-10-2021, 08:45 PM
Bgill Bgill is offline
 
Join Date: Sep 2017
Location: Douglas, GA
Posts: 77
Default Images

I tried to pose a few images from Smugmug but had issues this morning.
Tried to PM to you a bit ago. Let me know if you don't receive
__________________
Byron
RV-14A 140466 In build - Final Assy.
RV-10 40253 N253RV Sold
Douglas, GA. 2020 Dues paid
Reply With Quote
  #8  
Old 01-10-2021, 09:08 PM
Kyle Boatright Kyle Boatright is offline
 
Join Date: Aug 2005
Location: Atlanta, GA
Posts: 4,371
Default

There are lots of ways to do it. Once upon a time, people use to set the fuselage upside down on sawhorses or other platforms, and buck the rivets while sitting under/inside the canoe.

Worked just fine.
__________________
Kyle Boatright
Marietta, GA
2001 RV-6 N46KB
2019(?) RV-10
Reply With Quote
  #9  
Old 01-13-2021, 04:54 PM
Meat Meat is offline
 
Join Date: Jan 2018
Location: Glendale, AZ
Posts: 21
Default

Thanks for everyone's response. I appreciate everyone's time and advice. Things are moving forward on the fuselage.

Cheers,
Scott
__________________
QB RV-14 #140702
Empennage kit finished
Working on fuselage
Reply With Quote
  #10  
Old 01-28-2021, 05:46 AM
rockitdoc's Avatar
rockitdoc rockitdoc is offline
 
Join Date: May 2020
Location: Fort COllins, CO
Posts: 129
Default

put a sheet of 1/4" hardboard over the baggage floor. Even if you stand on a segment between the ribs, it held. Plywood would be better, but not necessary.

I riveted everything I could reach standing next to the fuse myself, then while I laid on my back underneath with my mushroom set, my 16 yo son bucked each rivet inside on the lateral joints. Worked great. 2 hrs.
Attached Thumbnails
Click image for larger version

Name:	Fuse Mating.jpg
Views:	113
Size:	365.8 KB
ID:	7561  Click image for larger version

Name:	Baggage Floor Substructure.jpg
Views:	103
Size:	310.0 KB
ID:	7562  
__________________
14A
Begun 07-23-20
Emp Completed 11-12-20
Slo Fuse Begun 11-13-20
QB Wings expected 3-21
Finish Kit expected 5-21
Thunderbolt EXP119 expected 7-21
2021 Dues Paid
Reserved: N752XP

Last edited by rockitdoc : 01-28-2021 at 05:49 AM. Reason: Photos added
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 10:10 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.