Does anyone have a regulatory reference that says the phase 1 testing period must be completed prior to being issued a repairman certificate.
I’m trying to get my repairman certificate, running into small roadblocks with a new FSDO inspector who hasn’t done them before.
I’ve looked in AC 65-23A, and don’t see that “phase 1 completed” requirement.
Not trying to subvert the system, but to gain some knowledge that I may be missing.
Thanks.
I’m trying to get my repairman certificate, running into small roadblocks with a new FSDO inspector who hasn’t done them before.
I’ve looked in AC 65-23A, and don’t see that “phase 1 completed” requirement.
Not trying to subvert the system, but to gain some knowledge that I may be missing.
Thanks.