VansAirForceForums  
Home > VansAirForceForums

-POSTING RULES
-Advertise in here!
- Today's Posts | Insert Pics

Keep VAF Going
w/a Donation






VAF on Twitter:
@VansAirForceNet

  #1  
Old 03-14-2023, 04:41 PM
Timinfla2's Avatar
Timinfla2 Timinfla2 is offline
 
Join Date: Sep 2015
Location: Merritt Island, FL
Posts: 41
Default F-1065 thread engagement

Hi there folks, we are installing the F -1065 push rod today and we noticed that we have about 3/8 of an inch of threads engaged into the hex rod. Is this enough? We are concerned that we might not have enough threaded material inside the hex rod to make it structurally sufficient, and the instructions don’t seem to see a lot on the topic unless we overlooked them.
Attached Thumbnails
Click image for larger version

Name:	03552C68-5B35-4E34-BA7A-D9D7F67C60A4.jpg
Views:	87
Size:	288.7 KB
ID:	39715  Click image for larger version

Name:	C0A0FA81-1066-4D44-98CF-EF0BD5F95E19.jpg
Views:	77
Size:	302.6 KB
ID:	39716  Click image for larger version

Name:	62489F8C-EE3A-4218-8194-01C5F0110181.jpg
Views:	69
Size:	345.0 KB
ID:	39717  
Reply With Quote
  #2  
Old 03-14-2023, 05:59 PM
PaulvS's Avatar
PaulvS PaulvS is offline
 
Join Date: Aug 2019
Location: Western Australia
Posts: 1,391
Default

The rod ends should thread in at least half way so that neither end can thread out in case the control rod comes loose and turns (either direction). Have you confirmed that the sticks are parallel and that the actual control rod is the correct length (20.5" I believe).
__________________
Paul vS (yes I'm also a Van)
Building RV-6A #22320 O-320 FP. Airframe structure 95% complete, now working on integration, plumbing and wiring.
Flying my Aeroprakt A-22 STOL and the aero club's RV-9A while I build
Reply With Quote
  #3  
Old 03-14-2023, 06:50 PM
bbsdad bbsdad is offline
 
Join Date: Oct 2018
Location: tx
Posts: 157
Default

A minimum of 1/2 inch thread engagement is required on those rod ends. Check the other side possibly you have room to extend their.

Hope this helps
RD
__________________
RV-6 o-360, WW ga200 prop. 90% to go
Reply With Quote
  #4  
Old 03-14-2023, 08:48 PM
Scott Hersha Scott Hersha is offline
 
Join Date: Jan 2005
Location: Cincinnati, OH
Posts: 2,567
Default

Quote:
Originally Posted by bbsdad View Post
A minimum of 1/2 inch thread engagement is required on those rod ends. Check the other side possibly you have room to extend their.

Hope this helps
RD
I didn’t think it was 1/2” , I thought it was 1/2 of the length of the thread. From your picture, 3/8” is not enough. No matter what control tube you are working on, 1/2 or more of the length of the thread engagement is required. It doesn’t look like you have that from your picture.
__________________
SH
RV6/2001 built 2000/sold 2005
RV8 Fastback/2008 built/sold 2015
RV4/bought 2016/sold/2017
RV8/2018 built/Sold(sadly)
RV4/bought 2019/sold2021
RV6/August 2022 build - Flying
Cincinnati, OH/KHAO
DEC2022
Reply With Quote
  #5  
Old 03-15-2023, 05:54 AM
Desert Rat Desert Rat is offline
 
Join Date: Aug 2018
Location: Wichita KS
Posts: 1,193
Default

more than 1/2 the threads minimum engagement for the reasons previously mentioned.

I'm not familiar with the 10 but it seems that perhaps something isn't rigged properly to get the result you have in the picture.
__________________
Terry Shortt
AGI, CFI, CFII, MEI, A&P, Janitor
RV7 Empennage & Wing done
Fuselage almost done
Avionics almost done
90% done, 90% to go
#72651
https://eaabuilderslog.org/?blprojec...t=all&listcat=
Reply With Quote
  #6  
Old 03-15-2023, 01:02 PM
Timinfla2's Avatar
Timinfla2 Timinfla2 is offline
 
Join Date: Sep 2015
Location: Merritt Island, FL
Posts: 41
Default

YEP, y'all are right - I boned this up by not ensuring the sticks were parallel (which they are not). I'll get them adjusted and re-measure the posts which I'm confident will be sufficiently threaded into the rod.

Thank you for the tips!
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 03:00 AM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.