What do you guys recommend with regard to ordering the electric trim and tail lights? Should I order them at the same time that I order the tail kit, or can I, or should I, wait?
The elevator trim is installed in the elevator - no reason to wait. The tail light is installed into the fiberglas fairing at the bottom of the rudder. You could wait to install it, if you plan to wait and complete all of your fiberglas later.