I have a chance to get what I think is a great deal on a 2012 RV12 with 70 hours on it originally built by David Miller at Benton Air Center in Redding, CA. My concern is the "list" of outstanding SB's and the related cost. It's also not been conditional inspected since June 2019 so it's almost two years out. Can anyone, especially builders or A&P's give me just a general ballpark on what they think the expense would be on following:
-- SB 19-07-29 Replace carburetor circlip if required. NOT COMPLETED.
-- SB 13-12-12 Seal instrument panel bay. Shipped before 12/2013 so needed. NOT COMPLETED ???
-- N 18-07-12 Replace possible under-pressure electric fuel pump. NOT COMPLETED
-- N 18-04-06 Update voltage regulator and relocate. NOT COMPLETED
-- N 16-11-04 Canopy struts update. Originals can break. NOT COMPLETED
-- N 16-10-03 Install canopy catch. NOT COMPLETED
-- N 14-06-30 Oil hose reroute. NOT COMPLETED
-- N 14-05-22 Canopy unlatched warning light. NOT COMPLETED
-- N 12CX 08-27-12-1 Wiring change to Skyview. NOT COMPLETED ???
-- N 02-11-13 Light and strobe switch errors. NOT COMPLETED ???
-- N FF-1207 Shroud allen screw access for periodic inspections. NOT COMPLETED
-- SB 19-07-29 Replace carburetor circlip if required. NOT COMPLETED.
-- SB 13-12-12 Seal instrument panel bay. Shipped before 12/2013 so needed. NOT COMPLETED ???
-- N 18-07-12 Replace possible under-pressure electric fuel pump. NOT COMPLETED
-- N 18-04-06 Update voltage regulator and relocate. NOT COMPLETED
-- N 16-11-04 Canopy struts update. Originals can break. NOT COMPLETED
-- N 16-10-03 Install canopy catch. NOT COMPLETED
-- N 14-06-30 Oil hose reroute. NOT COMPLETED
-- N 14-05-22 Canopy unlatched warning light. NOT COMPLETED
-- N 12CX 08-27-12-1 Wiring change to Skyview. NOT COMPLETED ???
-- N 02-11-13 Light and strobe switch errors. NOT COMPLETED ???
-- N FF-1207 Shroud allen screw access for periodic inspections. NOT COMPLETED