So,
I am now looking at the VS and the fact the there are 3 pre drilled holes in the sternpost of the QB kit, all at 3/8ths.
These have to be transferred onto the VS rear spar.
On the 7, we drilled forward up to 3/8ths - how am I going to drill backwards through already drilled 3/8ths holes into the VS rear spar to locate it ?
I am now looking at the VS and the fact the there are 3 pre drilled holes in the sternpost of the QB kit, all at 3/8ths.
These have to be transferred onto the VS rear spar.
On the 7, we drilled forward up to 3/8ths - how am I going to drill backwards through already drilled 3/8ths holes into the VS rear spar to locate it ?