flymustangs
Well Known Member
The plans call for assembling (riveting) the rear spar of the horz stab before fitting the hinges for the elevators. Is there anything wrong with fitting these while the rear spar channels and flange strips are clecoed to the jig? I would drill them undersize and final drill once the rear spar was riveted. Just trying to minimize set up time and priming sessions.
Thanks.
Thanks.