Another milestone: initial wing fitting. Van's matching of the QB wings and fuselage really paid off; overall it went very smoothly. Thanks to four of the PTK gang (from left to right): Curt Martin, Dave Pohl, Terry Kohler and Ted Gauthier for their able assistance.
I couldn't resist reinstalling the empennage. Time to set the incidence, fit the ailerons, flaps and fairings, connect the controls and check rigging before it all comes apart again. After that, the next reassembly will be the final one... but lots of work to do before then.
I couldn't resist reinstalling the empennage. Time to set the incidence, fit the ailerons, flaps and fairings, connect the controls and check rigging before it all comes apart again. After that, the next reassembly will be the final one... but lots of work to do before then.
Last edited: