dspender

Well Known Member
Friend
Patron
Planning to order and begin fabrication of my second RV 10. This time I plan to order the quick build fuselage . My recollection is with my previous slow build I could run wires between the lower skin and a floorboard. As a quick build kit comes anre some elements of the floorboard removable or available to pass conduit between the floorboard and lower fuselage skin so that I can route wires from back to forward.
 
My qb fuse came with the floors temporarily pop riveted. Easy to remove them except for the front foot wells. Those I did not mess with.
 
My QB did not have any baggage area floor installed. Good access at that end. But IIRC Once past the baggage door (moving forward) I transitioned over to the side walls to move forward.