flydjd
Well Known Member
Hi all,
With reference to the 7 QB fuselage and Dwg 38 - detail F fuel tank attach bracket detail, has anyone else found that it arrived with the 5 rivets installed at this location ? (all AN426 3 x AD3's and 2 x AD4's)
This is a royal pain in the backside as these all have to be drilled out and the 3 x AD3's have the F-902 bulkhead flanges dimpled which will cause a problem with the 2 spacers sitting flush.
I have e-mailed Van's Tech but haven't heard back yet.
If others have had this on their QB's how did you deal with it please ?
With reference to the 7 QB fuselage and Dwg 38 - detail F fuel tank attach bracket detail, has anyone else found that it arrived with the 5 rivets installed at this location ? (all AN426 3 x AD3's and 2 x AD4's)
This is a royal pain in the backside as these all have to be drilled out and the 3 x AD3's have the F-902 bulkhead flanges dimpled which will cause a problem with the 2 spacers sitting flush.
I have e-mailed Van's Tech but haven't heard back yet.
If others have had this on their QB's how did you deal with it please ?