A couple days ago, I finished riveting the ribs on the left wing. At the end of the instructions were two notes. The first note instructs to install manufactured heads on the rib side, not the flange side. The second note says to use LP4-4 rivets to attach the nose ribs aft flange to the spar assy.
Since the note was at the end of the instructions, I had completed the riveting, and used all LP4-3 rivets. I called Van's, and after some checking there, they said leave the rivets as they are. They said I was the first one to call this one in. I can't believe that no one else is as stupid as I am?
Anyway, I am posting this as a notice to those who are have not done the riveting on the wings to be aware.
Bill
Since the note was at the end of the instructions, I had completed the riveting, and used all LP4-3 rivets. I called Van's, and after some checking there, they said leave the rivets as they are. They said I was the first one to call this one in. I can't believe that no one else is as stupid as I am?
Anyway, I am posting this as a notice to those who are have not done the riveting on the wings to be aware.
Bill