I have the fuel and vents lines done and installed. Brakes are completed and tubing is installed. The rudder pedals also except for the attachment of the rudder cables. FI pump and tubing installed along with manual trim cable. I want to start attaching electronics so is there anything else I need to have done and installed before I rivet the structure over that area? Thanks,
Nick
Nick