herve-RV7
Active Member
I'm just wondering what to do after fuselage. I'm about half the way to finish the fuselage, and I have a motor stored in very good conditions in a very dry place, while my workshop is relatively humid. My logical conclusion is that I don't have to go too fast on the engine installation in order to avoid to expose the engine too much to humidity . I feel that maybe electrical, then panel and then canopy could be good next steps. I also try to consider cash management for the sequence definition. Any good suggestion/ recommandation based on experience would be welcome. Thanks in advance.