Myrv14

JVL
Sponsor
I’m finishing up on the Aft Fuselage and have a question for those ahead of me. I’ve attached an excerpt from the Vertical Stabilizer section on page 06-04. The plans instruct you to “leave open” one of the rivet holes on the Rudder Hinge Bracket.....I did.

http://photos.app.goo.gl/J4mvLLNNwW6XOgVI3

So, moving on to page 11-07 (excert below) and the Vertical Stabilizer attachment. It shows the use of two AN3-6A and three AN4-6A bolts. However, still doesn’t address the “open” hole in the Hinge Bracket. I also can’t find anything in the plans discussing what hardware (if any) is used on this “open” hole.

http://photos.app.goo.gl/fBb04WEu0akNz6v52

So, does anyone know what’s the deal with this “open” hole? Is it actually left “open” or did I miss something in the plans?

Jason
 
Last edited: