tomcostanza
Well Known Member
I'm about to drill the steps for attachment to the fuse. The instructions say to be sure to run a row of rivets through the flange of F-724 vertical rib. What have you done about the skin-to-F724 rivets and spacing between those existing rivets and the new rivets for the steps?
TIA,
TIA,