After spending about an hour lying in the rear fuselage pondering where I am going to run and mount the Skyview cabling, I thought I take a shot at seeking some suggestions.
Situation:
The ADAHRS is mounted in rear of tail cone. I have to connect the two AP servos, so I am dealing with two splitters and six D connections. My initial through was to mount one of the splitters under the right seat adjacent to the side, using tie wraps to secure the D connectors to the rib. I have limited space to work with the seat pan riveted in place. This splitter would capture the cable from the roll servo in the wing and the cable from the SV-1000 screen on the panel. I would run a cable from the splitter along the fuselage under the baggage compartment floor into the tail cone and connect to a splitter mounted somewhere along the longeron. This splitter would capture the pitch servo and the cable from the ADAHRS in the rear of the tail cone. Seemed reasonable until I thought about how I would hold down the D connectors, tie wrap to the longeron?, use cushion clamps on the longeron? Construct a panel to hold all the connectors and mount the panel to the longeron in some fashion?
Any thoughts on how to handle this situation would be welcome.
Situation:
The ADAHRS is mounted in rear of tail cone. I have to connect the two AP servos, so I am dealing with two splitters and six D connections. My initial through was to mount one of the splitters under the right seat adjacent to the side, using tie wraps to secure the D connectors to the rib. I have limited space to work with the seat pan riveted in place. This splitter would capture the cable from the roll servo in the wing and the cable from the SV-1000 screen on the panel. I would run a cable from the splitter along the fuselage under the baggage compartment floor into the tail cone and connect to a splitter mounted somewhere along the longeron. This splitter would capture the pitch servo and the cable from the ADAHRS in the rear of the tail cone. Seemed reasonable until I thought about how I would hold down the D connectors, tie wrap to the longeron?, use cushion clamps on the longeron? Construct a panel to hold all the connectors and mount the panel to the longeron in some fashion?
Any thoughts on how to handle this situation would be welcome.