G Gandalf Well Known Member Sep 30, 2013 #1 Here are some pics of the firewall and side wall stiffener done as part of the build. To be clear: six holes remain to be drilled in the side skin. Last edited: Sep 30, 2013
Here are some pics of the firewall and side wall stiffener done as part of the build. To be clear: six holes remain to be drilled in the side skin.