LittleJoeA

Well Known Member
Hi All,

I was starting the installation of the finish kit with Section 31B, the Fuselage Wiring Harness. That section shows the F-0027 supports already installed. It seems to me that performing Section 42D page 03 - 09 which modifies the F-1202B panel base is a good thing to do first, before the wiring is in the way. Anything else I should do prior to starting Section 31B?

Thanks