rjm727
Well Known Member
Page 10-14, Step 8, has us routing wiring (WH-00057 and WH-00059) along the j channel through the F-01407 and F-01408 bulkheads. I have everything clecoed in place but I am not comfortable with routing the wires (unprotected) through the bulkheads. I am concerned about chafing as time goes by. Has anyone else changed the wiring routing? I am thinking about running some conduit through the lightening holes and running the wires through there. Any issues with this?
Last edited: