timandmeli
Well Known Member
Hi all. I'm building up the center section of my fuselage spar carry through. There is a vertical piece F-804G-1 that gets riveted vertically in between the upper and lower spar caps. The plans call for AD4-14 rivets which seem a little short and haven't really formed an adequate head. In between the rivets are two 1/4 in holes for i'm assuming bolts? I cant seem to find it in the plans. Any ideas