jfterrones

I'm New Here
VANS RV-10 Empennage - Delivered and built in 2023. Most of the red LCP parts replaced with the exception of a couple in the tailcone bulkheads. All parts primed with two-part epoxy primer. I’m building another plane and don’t have time or space to build both. My wife says move it out so someone could end up with a great deal. Will consider all offers. PM me if interested. Full build log and photos available on EAA website.
 

Attachments

  • IMG_8852 (2).jpeg
    IMG_8852 (2).jpeg
    935.3 KB · Views: 24
  • IMG_9633 (1).jpeg
    IMG_9633 (1).jpeg
    795.7 KB · Views: 24
  • IMG_9657 (1).jpeg
    IMG_9657 (1).jpeg
    914.8 KB · Views: 25