thomaswimmer
Member
Hi,
I'm just wondering about the top rob of the rivets holes on F-773 (at the back where the aft deck is).
The fuselage didn't came rivetted from the QB-factory.
Do I close them now (currently in the stage of fuselage construction), or do they get rivetted with the lower empennage gap cover (F-994A)?
Thomas
I'm just wondering about the top rob of the rivets holes on F-773 (at the back where the aft deck is).
The fuselage didn't came rivetted from the QB-factory.
Do I close them now (currently in the stage of fuselage construction), or do they get rivetted with the lower empennage gap cover (F-994A)?
Thomas