HS-409 to HS-403 (main spar webs to main spar on the HS) is the MFG head inside the HS or is the MFG head outward? I am riveting right now and the answer from Vans was "The rivets face aft on the HS-409" ??? I am riveting so the MFG head is on the outside, is this correct?