I'm building the F-705 bulkhead for a 7-A tip-up. The 705-G angle, on the plans, shows only 4 rivet holes and an oblong hole. However, the 705-D,E and F (the side pieces and the top of F-705 bulkhead), to which the angle is riveted, shows a few more holes. The angle is not to be riveted at this point, but I would like to match drill all the holes. Those of you who have already done this, are all of those "extra" holes match-drilled, and eventually riveted?
Also, the pieces (spacer and L?) that are riveted to the top of 705-F (the top horizontal piece of the 705 bulkhead) are to be riveted with flush heads toward the top. These are -4 rivets, and the materials are somewhat thin. Did you guys dimple or countersink to install these rivets?
Thanks in advance for your replies!
Also, the pieces (spacer and L?) that are riveted to the top of 705-F (the top horizontal piece of the 705 bulkhead) are to be riveted with flush heads toward the top. These are -4 rivets, and the materials are somewhat thin. Did you guys dimple or countersink to install these rivets?
Thanks in advance for your replies!