How far ahead do you read in the plans? For example, our EMP kit is somewhat complete. The top skins are not riveted. Should we look far ahead to start doing things like installing push rods, hardware, and wire, or should we simply wait.... We have read through the Fuse kit at this point.
Thanks,
Mike
EDIT: Should have mentioned that mentally build as I review the plans. So, I've mentally built the wings 3 times and the fuse 1. I make and use drawings for my day job (not mechanical, though), so I've not had problems learning that. Thanks for your thoughts!
Thanks,
Mike
EDIT: Should have mentioned that mentally build as I review the plans. So, I've mentally built the wings 3 times and the fuse 1. I make and use drawings for my day job (not mechanical, though), so I've not had problems learning that. Thanks for your thoughts!