andrew phillips
Well Known Member
I have the dynon pitot w/ angle of attack. I need to bring 2 lines through the fuselage and to the panel. Should I bring them in beside the aileron rod hole, under the seat, up the center tunnel or should I go straight up the fuselage sidewall and run along below the longeron? If I run below the longeron will this affect the installation of pre-made side panels later on?
Any thoughts?
Any thoughts?