On page 29A-05 step 5 it says "Rivet the nutplates to the aft flanges of the panel base and the F-00026L and R Inst Stack Angles....."
Figure 3 and subsequent figures clearly show 20 places for nutplates on the aft flange of F-1202B Panel Base and the nutplate callout specifies 20 of them. Here's the problem: My F-1202B Panel Base has only 14 places for nutplates on the aft flange. The center portion of the flange, where the F-00023 Center Inst Panel would attach, has six #40 holes rather than provisions for nutplates. I would think my Panel Base was made incorrectly but the Homebuilt Help video shows the same thing.
I also don't understand the second part of the quoted sentence which implies that nutplates should be also riveted to the Inst Stack Angles. I think all the nutplates which attach to these were installed on page 29A-04. There are two provisions for nutplates on each stack angle which apparently don't get used, but I don't think that's were additional nutplates go.
Any help will be greatly appreciated. I've spent hours trying to resolve this.
Jerre
Figure 3 and subsequent figures clearly show 20 places for nutplates on the aft flange of F-1202B Panel Base and the nutplate callout specifies 20 of them. Here's the problem: My F-1202B Panel Base has only 14 places for nutplates on the aft flange. The center portion of the flange, where the F-00023 Center Inst Panel would attach, has six #40 holes rather than provisions for nutplates. I would think my Panel Base was made incorrectly but the Homebuilt Help video shows the same thing.
I also don't understand the second part of the quoted sentence which implies that nutplates should be also riveted to the Inst Stack Angles. I think all the nutplates which attach to these were installed on page 29A-04. There are two provisions for nutplates on each stack angle which apparently don't get used, but I don't think that's were additional nutplates go.
Any help will be greatly appreciated. I've spent hours trying to resolve this.
Jerre