I am about to install my first set of replacement tires on my RV6.
I got about 130 hours on the original rubber that came in the finish kit. I have no idea on the exact number of landings but I do like to practice landings so I would estimate at least 5 landings per hour average = 600 or so landings. Almost all of this on concrete. (I think I had a brake dragging for the first 5 hours, the bolts on the pedal were binding up and not letting thepedal release.)
Is this typical for the cheap aerotrainers or whatever they are that come in the kit?
I am trying a retread from dresser this time around.
Jim D.
I got about 130 hours on the original rubber that came in the finish kit. I have no idea on the exact number of landings but I do like to practice landings so I would estimate at least 5 landings per hour average = 600 or so landings. Almost all of this on concrete. (I think I had a brake dragging for the first 5 hours, the bolts on the pedal were binding up and not letting thepedal release.)
Is this typical for the cheap aerotrainers or whatever they are that come in the kit?
I am trying a retread from dresser this time around.
Jim D.