yankee-flyer

Well Known Member
Completed the Fuselage kit today but I still have an open rivet hole on each sde at the upper front of each side skin. On page 29-02, step 6 (Fig 4) you're told to leave open the bottom hole of the lowest nutplate omn either side. The fuselage side skin and space below it are dimpled, but I simple cannot find anyplace where I'm told to rivet that hole and nutplate. The other rivets for the side skins are all LP4-3. Did I miss something, did the instructions miss something, or will something go there later in the construction sequence?

Thanks.

Wayne Moyer
120241 N143WM reserved
Emp kit, wing kit, and fueselage kit completed.