I'm currently working on the Practice Kit and should be ordering the empennage in the next week or so. I ran into a small problem today riveting the ends of the practice kit project (the reinforcement/spar/rib combination).
Basically, when the shop head of the rivet is being formed the rib flange wants to lift up off the spar leaving a gap once the rivet is set. I played around with a number of different ideas to prevent this but I'm not sure if its possible.
Is there some way to prevent this gap from forming?
Basically, when the shop head of the rivet is being formed the rib flange wants to lift up off the spar leaving a gap once the rivet is set. I played around with a number of different ideas to prevent this but I'm not sure if its possible.
Is there some way to prevent this gap from forming?