As I've wired my peripherals to the panel, I've been using a power supply to test things with. Finally, the last connections (with the exception of some sensors to the Engine Pod) have been made and I can finish cleaning up the wiring runs and get that 'last skin' on. More importantly, the power supply is replaced with the battery (supplemented by a trickle charger) and so now I can run everything at once rather than just what the 10A supply could support. Everything except the Lightspeed Ignitions has been ground tested now; even the ground tests for the autopilot have been completed. Yay! Next milestone, engine start.
Sorry about the whiteout in the background; the picture was taken from my hangar facing into bright sunlight.
Sorry about the whiteout in the background; the picture was taken from my hangar facing into bright sunlight.
![DSC01375.jpg](/community/proxy.php?image=http%3A%2F%2Fwww.flion.com%2Fimages%2FDSC01375.jpg&hash=09fc2e814ca17863ed505f9c5a8baf87)