steve wyman
Well Known Member
I thought I would run this by the guys who are ahead of me on the RV-12 build. I am on section 24 of the fuselage ( the roll bar assembly). At this point in the build, I have, at most, 500 or 600 LP4-3 rivets left. I haven't finished the fuselage, nor even begun the tailcone/ empannage kit. I'm certain that I won't have enough rivets left to finish the construction. I have had to throw out several hundred rivets that were mangled in the manufacturing process, but even so, this should not account for so large a disparity in the remaining rivets vs. what are still needed. Is this the situation you other guys have encountered? Steve